How it works
From raw land to a signed lease, in four steps.
We do the slow, local work first, so compute gets a site that is already checked.
- Step 1
We find and lock the site.
We work with landowners and IDAs to find sites with power close by. We note the MW at the transformer, fiber, water and a lease ballpark. The owner signs a Host Engagement Letter: site control for us, and permission to talk to the utility.
Output: Host Site Package
- Step 2
We bring the site to compute.
We show compute a set of sites we already control, anonymous until there is an NDA. If they like a site, they sign a Site Acquisition Agreement with us. If they like us but need a different area, we sign a short search agreement and go find sites there.
- Step 3
We deliver the Due Diligence Package.
Preliminary electrical qualification, utility engagement and feasibility, and physical site feasibility. One delivery, three parts.
Output: Due Diligence Package
- Step 4
The host and compute sign a lease.
We help both sides get to a lease that works: power confirmed, site control confirmed, terms agreed, permits in hand. The host leases directly to compute.
- Optional
Turnkey development.
If you want us to run the build, we manage it to power on. We own the timeline. You pay the costs at cost, plus a separate development fee.
The checklist
What makes a site work
- Power at the transformer
- A utility that will engage
- Fiber close by
- Room for the pad, setbacks and trucks
- Zoning that allows it
- A landowner who wants it