Site origination for edge compute
Power-ready edge compute sites.
We find edge compute sites nationwide, near major metros, with power close by. We lock them up with the landowner, check them with the utility, and hand compute companies a vetted site they can lease.
Near major metrosClose to users and fiber
Checked with the utilityPower, fiber and fit checked before you commit
Speed to powerSites with power close by, not a long wait in a large-load queue
The problem
Power is the hard part.
Compute is moving closer to users, and it needs power now. The big utility queues can take years. Meanwhile, plenty of good land near cities already has power close by. The owners just have no easy way to reach compute buyers. That is the gap we close.
What we do
What we do. Three things.
Site origination
We find sites with real power nearby and lock them up with the landowner with a short agreement that holds the site (Host Engagement Letter).
Pre-development screening
Our site check report (Due Diligence Package) covers the three things that kill deals: a first check of how much power the site can take (preliminary electrical qualification), utility engagement and feasibility, and physical site feasibility.
Turnkey development
If you want, we run the build. We manage the project and own the timeline. Costs pass straight through.
The site
What an edge compute site looks like.
A fenced pad on industrial land. A transformer fed by the local utility. A row of modular compute units. Fiber coming in from the street. That is it. The landowner keeps the land.